Skip to content

Ballynalacken Windfarm Planning

  • Home
  • Planning
  • Environmental
  • Photomontages

Environmental

Volume C:
Environmental Impact Assessment Report (EIAR)

Non-Technical Summary of the EIAR

Each of the Chapters below contain the Chapter Figures and Appendices

  • Chapter 1: Introduction & Policy Context
  • Chapter 2: EIAR Process and Presentation
  • Chapter 3: Consultation
  • Chapter 4: Alternatives Considered
  • Chapter 5: Description of the Development
  • Chapter 6: Land
  • Chapter 7: Soils
  • Chapter 8: Water
  • Chapter 9: Air (Air Quality & EMF)
  • Chapter 10: Noise & Vibration
  • Chapter 11: Shadow Flicker
  • Chapter 12: Climate
  • Chapter 13: Biodiversity
  • Chapter 14: The Landscape
  • Chapter 15: Cultural Heritage
  • Chapter 16: Material Assets
  • Chapter 17: Population & Human Health
  • Chapter 18: Interaction of the Foregoing
  • Chapter 19: Mitigation and Monitoring Arrangements
  • Chapter 20: Summary of Impacts

Volume D: Environmental Management Plan

  • Environmental Management Plan (Main Document)
  • Tab 1: Grant of Permission including Planning Conditions
  • Tab 2: Site Drainage Drawings
  • Tab 3: Mitigation & Monitoring Arrangements
  • Tab 4: Emergency Response Procedures
  • Tab 5: Surface Water Management Plan
  • Tab 6: Traffic Management Plan
  • Tab 7: Waste Management Plan
  • Tab 8: Contractors Method Statements (to be added post consent)
  • Tab 9: Construction Programme (to be added post consent)

Volume E: Appropriate Assessment Report including Figures and Appendices

  • Appropriate Assessment Report

Rowanmere Limited

c/o Ecopower Developments Limited, Zetec House, IDA Purcellsinch Business Park, Kilkenny, Ireland

Ballynalacken Windfarm Planning